CLEVENGERS VILLAGE WWTP
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water Treatment |
| Work Type: | New |
| Bid Date: | 2006-06-01 |
Water Treatment Storage Concrete Foundation Construction Of A New Waste Water Treatment Plant, The Plant Is A 0.9 Million Gallon Per Day Plant And Includes A Preliminary Treatment Facility Consisting O Influent Screening, Grit Removal, And Flow Measurement , A Biological Nutrient Removal Facility Consisting Of Flow Equalization And Influent Pumping Station, Aeration, Anoxic, And Fermentation Basins, Secondary Clarifiers And Return And Waste Sludge Pumping Stations, Aerobic Sludge Digesters, Effluent Filters, Ultraviolet Disinfection, Post Aeration, Belt Filter Press Building,Chemical Storage And All Associated Site Work And Piping
Project Participants edit/contribute
Project Location
| Address: | Rt 211 Culpeper, VA 22701 |
| County: | Culpeper |
More Virginia construction projects are available via our Virginia construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

