WILLOW CREEK FLOOD DAMAGE
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Flood Control, Sewage Piping |
| Work Type: | Alteration |
| Bid Date: | 2006-12-06 |
Dams, Excavating & Grading, Flood Control, Canals, Sewage Piping Grade Restoration & Erosion Protection Within & Adjacent To Portions Of Willow Creek From The Vicinity Of Willow Creek & Willow Lake Roads Upstream To A Point Near Willow Creeek & Pleasant Valley Dr, Areas 1 & 2 Bypass Pumping, Reconstruction Of 60 Ft Of 10" DIP, 806 CY Of Rock Stabilization Material Ranging In Size From 4" To 24" In Close Proximity To Willow Creek Rd, Bridge, Area 3, 22 CY Of 24" Rock Stabilization & 555 CY Of Rock Grade Material Ranging In Size From 4" To 6" Approx 1/4 Miles Upstream Of Willow Creek Rd Bridge Area 4, By-Pass Pumping, Reconstruction Of 110 LF Of 10" DIP, 2,363 CY Of Rock Grade & Stabilization Material Ranging In Size From 2" To 12" Upstream Of Jack Drive
Project Participants edit/contribute
Project Location
| Address: | Various Locations Prescott, AZ 86302 |
| County: | Yavapai |
More Arizona construction projects are available via our Arizona construction news and information page. Information on local building codes is available as well

