Project Overview edit/contribute
| Project Type: | Airport Runways |
| Work Type: | Alteration |
| Bid Date: | 2007-03-20 |
Airport Construction, Road[s], Water Piping, Demolition, Excavating & Grading, Pavement Markers Runway 9-27 Safety Area Improvements Design- Package 1 Including Mass Grading, Drainage, Pavement Removal & Replacement, Paint Marking & Airfield Electrical, Other Miscellaneous Items, 530,000 Cubic Yards Of Rock Excavation; 1,874 Crushe Aggregate Base course; 9,387 Square Yards Of Runway Pavement Removal, 1,594 Ton Bituminous Paving, 9,445 Square Yards Of Saw Cutting Grooving; 328 Linear Feet 36 Storm Drain Pipe, 7,958 Square Feet Pavement Markings; Airfield Electrical Demolition; 16,350 Linear Feet Of Cable, Cable Trenching & counterpoise Wire & 12 Runway Edge Lights.
Project Participants edit/contribute
Project Location
| Address: | 1500 last Dollar Road Telluride, CO 81435 |
| County: | San Miguel |