MIDDLE RIVER WASTEWATER TREATMENT PLANT
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water Treatment, Sewage Treatment |
| Work Type: | Alteration |
| Bid Date: | 2007-09-13 |
Sewage Treatment ENR Upgrades - Grit Removal Facility With Vortex Type Units, Grit Cyclone Separators, Grit Classifiers And Parshall Flumes, Conversion Of Existing Basins To BNR Basins With Fine Bubble Diffuces Aeration, Submersible Mixers, Internal Recycle Pumps And Scum/Foam Handling, Scum Pumping Station Manholes And Meterin Vaults, Multi-Stage Centrifugal Aeration Blowers And Controls, Secondary Clarifier With RAS Pump, Secondary Effluent Polishing Filters, Pre-engineered Metal Building Over Filter Complex, Filter Bypass Overflow Structure, Conversio of Exiting Primary Clarifier To House New Alum Feed Facilites, Carbon Source Storage And Feed Facility With Canopy Cover, Yard Work, Site Work, Erosion Control, Addition Of PLC-Based Plant Control System
Project Participants edit/contribute
Project Location
| Address: | Laufel Hill Rd Verona, VA 24482 |
| County: | Augusta |
More Virginia construction projects are available via our Virginia construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

