HAMILTON WETLAND RESTORATION PROJECT
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Flood Control |
| Work Type: | New |
| Bid Date: | 2007-07-25 |
Flood Control Hamilton Wetland Restoration Project, N-2 & South Levees & Intertidal Berms, Hamilton Army Airfield Novato, Marin County, California, The General Scope Of Work Consists Of: 1) Construction Of The N-2 & South Levees Using On-Site Borro Soils From The State Lands Commission Parcel Located Directly Adjacent To The Hamilton Army Airfield, The N-2 & South Levees Will Enclose The Tidal Wetland Area For Dredged Material Placement, 2) Construction Of Intertidal Benches On The Outboard Side Of The Levees, 3) Crushing On-Site Concrete Rubble To Create Aggregate Base & Placing On The N-2 Levee, & 4) Construction Of Five (5) Intertidal Berms
Project Participants edit/contribute
Project Location
| Address: | Hamilton Army Airfield Novato, CA 94945 |
| County: | Marin |
More California construction projects are available via our California construction news and information page. Information on local building codes is available as well

