MCCLELLAN PALOMAR AIRPORT TERMINAL
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Airport Terminals |
| Work Type: | New |
| Bid Date: | 2007-06-21 |
Restaurant, Transportation Terminal Mezzanine Cast In Place Concrete Foundation, Concrete Slab On Grade Foundation, Drilled Caissons, Drilled Piers, Pile Foundation, CMU Block Structural Frame, Structural Steel Frame, Masonry Exterior , Steel Bar Joist Roof Deck , Membrane Roofing, Package Air Conditioning/Heat Pump System Terminal; 11,934 Square Feet, 1 Story Building: Elevator Tower Two Story: Restaurant 2,481 Square Feet: & CBP 1,495 Square Feet: Grading; Paving; Utilities; Demolition & General Civil Work To Construct A Taxiway & Apron; Blas Fence; Parking Lots; Roads; Landscaping; & Miscellaneous Structures; New Terminal Buiding; Elevator; Pedestrian Bridge; Automated & Electronic Systems; Ancillary Improvements
Project Participants edit/contribute
Project Location
| Address: | 2192 Palomar Airport Rd Carlsbad, CA 92011-4409 |
| County: | San Diego |
More California construction projects are available via our California construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

