UCLA WWRG 2A-05 CATH LAB 5 INTERIOR
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | School Laboratories |
| Work Type: | Alteration |
| Bid Date: | 2007-07-27 |
School Laboratory The Project Consists Of Interior Improvements Of A Shelled Suite To Convert To Cath Lab On The Second Floor Of The Westwood Replacement Hospital (WWRH); WWRH Is A 1,260,000 GSF Structure Currently Under Construction And Scheduled For Occupancy By Fall 2007; The Suite Shall Include New Procedure And Equipment Rooms And Shall Be Constructed To Support The Installation Of One New Angiography Machine And Related Support Equipment; The Work Includes Providing: New Infrastructure Including Structural Steel Ceiling Support Systems; Heating, Ventilation And Air Conditioning (HVAC) Systems; Plumbing; Electrical Power And Data As Required In Support Of The New Angiography Equipment; Connections To Th Existing Automatic Fire Sprinkler And Fire Alarm Systems Shall Be Redistributed To Meet Applicable Code Requirements In The Suites; Door Assemblies From The Suites To The Adjacent Corridor Shall Be Provided To Comply With Applicable Fir Codes; Finishes Shall Include Ceiling Systems With Light Fixtures, Millwork, Painted Walls And Flooring
Project Participants edit/contribute
RSMeans Project Cost Estimate
| Original Estimated Project Cost: | $619900 |
The cost to build school laboratories in Los Angeles, California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to Ucla Wwrg 2a-05 Cath Lab 5 Interior, an accurate estimate of the costs to build your particular project is available on MeansCostWorks.com.
Or, RSMeans quick cost estimates are available for the following project configurations:
- College Laboratory with Decorative Concrete Block / Bearing Walls
- College Laboratory with Decorative Concrete Block / Bearing Walls
- College Laboratory with Decorative Concrete Block / Steel Frame
- College Laboratory with Decorative Concrete Block / Steel Frame
- College Laboratory with Face Brick with Concrete Brick Back-up / Bearing Walls
- College Laboratory with Face Brick with Concrete Brick Back-up / Bearing Walls
- College Laboratory with Face Brick with Concrete Brick Back-up / Steel Frame
- College Laboratory with Face Brick with Concrete Brick Back-up / Steel Frame
- College Laboratory with Stucco on Concrete Block / Bearing Walls
- College Laboratory with Stucco on Concrete Block / Bearing Walls
- College Laboratory with Stucco on Concrete Block / Steel Frame
- College Laboratory with Stucco on Concrete Block / Steel Frame
Project Location
| Address: | UCLA Cath Lab 5 Los Angeles, CA 90024 |
| County: | Los Angeles |
More California construction projects are available via our California construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

