CODOT I-70 BRIDGE
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Bridges & Culverts |
| Work Type: | Alteration |
| Bid Date: | 2007-09-06 |
Bridge[s] & Culvert[s], Park[s], Landscaping, Road[s], Fencing LOCATED ON INTERSTATE 70 AT MP. 22.88. ACCESS TO STRUCTURE H-02-FF IS AT THE JUNCTION OF I-70 FRONTAGE ROAD AND U.S. HIGHWAY 6. CONSISTING OF BRIDGE REHABILITATION WHICH INCLUDES CONCRETE CLASS D (BRIDGE), SEEDING, MULCHING, HOT MIX ASPHALT, BRIDGE RAIL, AND STRIPING.202-00503 Rem Port Present Str 711.000 S 212-00006 Seeding (Native) 0.250 ACRE 403-34701 HMA (Gr SX) (75) 94.000 TON 518-01004 Br Expan Device (0-4 In) 50.000 LF 601-03040 Conc CL D (Bridge) 156.000 CY 602-00020 Reinf Steel (Epoxy) 46,340.000 LB 606-11030 Brdg Rail Ty 10M 434.000 LF 626-00000 Mobilization 1.000 L S 630-00000 Flagging 300.000 HOUR 630-00012 Traf Ctrl Mgmt 50.000 DAY 630-80359 Port Mesg Panel 200.000 DAY 630-85040 Impact Atten (T-M-A) (Temp) 2.000 EACH
Project Participants edit/contribute
Project Location
| Address: | US Hwy 6 Appleton, CO 81505 |
| County: | Mesa |
More Colorado construction projects are available via our Colorado construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

