HAYNEVILLE MS GYM LOCKER AREA-ROOFING
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Junior High Schools |
| Work Type: | Alteration |
| Bid Date: | 2007-12-18 |
Junior High School Re-Roof Locker Room Areas AT Hayneville Middle School Gymnasium Demolition: Remove & Dispose Of The Existing Built-Up Roofing; Sitework: Maintain Site To Original/Pre-Construction Condition; Repair: Repair Existing Roof Framing, Roof Decking, Eave Framing, & Eave Wood Finishes As Needed; New Construction: Install New Roofing, Sheet Metal Siding, & Sheet Metal Flashing
Project Participants edit/contribute
Project Location
| Address: | 101 W Lafayette St Hayneville, AL 36040-2036 |
| County: | Lowndes |
More Alabama construction projects are available via our Alabama construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

