PRINCE WILLIAM CO ADULT DETENTION CTR
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Prisons |
| Work Type: | Addition/Alteration |
| Bid Date: | 2006-04-13 |
Prison Cells, Food Preparation, Food Storage, Infirmary, Sally Port Concrete Slab On Grade Foundation, Reinforced Concrete Foundation, Cast In Place Concrete Structural Frame, Structural Steel Frame, Masonry Exterior , Stucco Exterior, Metal Deck Roof Structure, Metal Roof Deck, Standing Seam Metal Roof, Membrane Roofing, Air Handling System, Chilled Water Cooling System, Package Air Conditioning/Heat Pump System Construct 5 Story 200 Cell Adult Detention Center, Intake, Holding Cells, Dayroom, Commercial Kitchen, Offices, Migistrates Offices Other Roof Structure = Concrete Roof Structure
Project Participants edit/contribute
Project Location
| Address: | 9320 Lee St & Mosby St Manassas, VA 20110 |
| County: | Prince William |
More Virginia construction projects are available via our Virginia construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

