DOVER AIR FORCE BASE FITNESS CENTER

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.
Want more project leads like this?
Learn about getting project leads from Reed Construction DataProject Overview
| Location: | Kent County, Delaware | Phase: | Post-Bid Phase |
| Building Type: | Gymnasium | Stage: | Post Bid Results Pending |
| Work Type: | Alteration | Bid Date: | 2009-07-07 |
| Last Updated: | 2009-07-08 | ||
Project Description
Military - Miscellaneous Athletic Training,Fitness,Locker Room Structural Steel Frame,Standing Seam Metal Roof construction of the Fitness Center (approximately 60,000 SF) and all related site work. The building is a one-story steel-framed facility (plus mechanical mezzanine) with a combination of EPDM and structural standing seam metal roofs. The facility will contain a single NCAA-sized basketball court (with two integrated adjacent high school cross courts), aerobic and exercise rooms, weight training rooms, fitness testing room, health and wellness classrooms, offices, male and female locker rooms/showers, entrance lobby, and admin support/storage. The work includes, but is not limited to: concrete footings foundation and slab flooring, masonry walls, structural steel framing, low sloping EPDM (rubber membrane) roofs draining to internal roof drains and sloped standing seam metal roof, glazed curtain wall, fiberglass sandwich panel assemblies, interior partitions, steel doors and frames, wood doors, tile and carpet flooring, wood and resilient athletic flooring, VCT flooring, acoustical ceilings, acoustical wall treatment, toilet and locker rooms, HVAC, plumbing, fire protection systems, electrical and incidental related work. Site work includes, but is not limited to, seeding/sodding, plants, irrigation sprinklers system, parking lots, roads, and incidental related work
Project Value
| Estimated Value: | $10,000,000 |
Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.
Register for a 7 day free trial of Means Costworks now!
Project Participants
CSI Categories Included in Project Scope
The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

