Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News

US flag LEWIS & CLARK REGIONAL WATER SYSTEM 85TH RESERVOIR

Project Leads | Construction News & Info
Click here to get general news & information about construction activity in South Dakota
 | Building Codes
Click here to see building codes for South Dakota

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.

Want more project leads like this?

Learn about getting project leads from Reed Construction Data
« Return to South Dakota Project Leads Page »

Project Overview

Location:Minnehaha County, South Dakota Phase:Bid Phase
Building Type:Sewage Treatment Stage:Biddate Set
Work Type:AlterationBid Date:2009-07-22
Last Updated:2009-06-30

Project Description

Water Treatment,Water Piping A 3.0 Million Gallon Composite Water Tower With A Height To Overflow Of 180 Ft, Ground Floor Of Water Tower Will Include An 1,800 Sq Ft Process Area, Including Interior Piping, Metering And Chemical Feed Equipment And 900 Sq Ft Of Administrative Area, Interior Piping Within The Tower Includes, But Not Limited To, Large Diameter Isolation Valves, Air Valves, Check Valves, Flow Control Valves And All Necessary Fittings, Chemical Feed Equipment Will Include Two (2) 1,000 Gallon Storage Tanks And Associated Chemical Feed Pumps For Sodium Hydroxide And Sodium Hypochlorite Systems, All Mechanical, Electrical And Control Equipment Necessary To Provide A Fully Functioning Facility, Site Piping Including Approximately 190 LF Of 36, 70 LF Of 24 And 205 LF Of 12 Diameter Piping Including Corrosion Protection (Including But Not Limited To Galvanic Anodes And Coatings), Site Work Including But Not Limited To Fill, Grading, Access Road Construction, Topsoiling, Seeding And Restoration, Construction Of 400 LF Of 8 Trunk Sanitary Sewer Pipe, A New Manhole And 210 LF Of 6 Sanitary Sewer Service Pipe, Approximately 225 Tons Asphalt Concrete Composite And 450 Tons Of Aggregate Base Course

Project Value

Estimated Value:$4,750,000

Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.

Register for a 7 day free trial of Means Costworks now!

Project Participants

Project Owner
Architects and Engineers

CSI Categories Included in Project Scope

The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

Demand for actionable leads growing in a tight economy.

Learn More!


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.