Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News

US flag FSP CLEAR AIR STATION COOLING POND

Project Leads | Construction News & Info
Click here to get general news & information about construction activity in Alaska
 | Building Codes
Click here to see building codes for Alaska

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.

Want more project leads like this?

Learn about getting project leads from Reed Construction Data
« Return to Alaska Project Leads Page »

Project Overview

Location:Denali County, Alaska Phase:Post-Bid Phase
Building Type:Power Station Stage:Post Bid Results Pending
Work Type:AlterationBid Date:2009-08-11
Last Updated:2009-08-12

Project Description

Power Lines,Water Piping,Electrical Work,Excavating & Grading,Fencing,Power Stations Provide all work to repair and replace the existing pond liner and screening system for the Power Plant Cooling Pond at Clear AFS, Alaska. Work includes, but is not limited to de-watering and cleaning of the pond; partial demolition and reconstruction of existing concrete intake structure and screens; removal of ballast and repair of gunite substrate, installation of new pond liner membrane; removal of existing pump, gate valve, piping, cooling tower foundation, electrical service, and fencing; construction of new cooling water piping; grading, seeding, and all incidental work for a complete and operational system. Additionally, repair or replacement of damaged or displaced existing gunite is required prior to installation of new liner. Approximately 500 SF of gunite surface requires repair or replacement. There is no known asbestos or asbestos containing material (ACM) present at the project site. The existing pump house structure, associated piping, pump and motor are assumed to contain lead based paint. Appropriate handling and disposal will be required to protect workers and the environment.

Project Value

Estimated Value:$1,500,000

Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.

Register for a 7 day free trial of Means Costworks now!

Project Participants

Project Owner

CSI Categories Included in Project Scope

The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

You can take a demo and receive a free trial version of SmartBIM Library Manager 3.0 - includes 2862 families representing 22950 product types.

Learn how!


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.