MARSHALL HIGH SCHOOL POOL IMPROVEMENTS

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.
Want more project leads like this?
Learn about getting project leads from Reed Construction DataProject Overview
| Location: | Calhoun County, Michigan | Phase: | Post-Bid Phase |
| Building Type: | Swimming Pool | Stage: | Post Bid Results Pending |
| Work Type: | Alteration | Bid Date: | 2009-08-17 |
| Start Date: | 2010-04-01 | ||
| Last Updated: | 2009-08-18 | ||
Project Description
Gym & Athletic Building Replace Pool Lay-In Ceiling & Light Fixtures, Miscellaneous Mechanical Work With Addition Of RTU Heat Recovery Unit, Structural Repairs To Four Steel Wind-Load Columns, Other Aesthetic Upgrades To Pool Area. Possible Alternate For Replacement Of Main Lighting Systems In Gymnasium BID PACKAGES: 4.2 Masonry, 5.1 Structural Steel, 6.1 General Trades, 9.2 Acoustical Ceilings, 9.9 Interior Painting, 21.1 Fire Protection, 23.1 HVAC, 26.1 Electrical
Project Value
| Estimated Value: | $600,000 |
Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.
Register for a 7 day free trial of Means Costworks now!
Project Participants
CSI Categories Included in Project Scope
The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

