DECATUR SEWER REHABILITATION PHASE 1

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.
Want more project leads like this?
Learn about getting project leads from Reed Construction DataProject Overview
| Location: | Morgan County, Alabama | Phase: | Post-Bid Phase |
| Building Type: | Water Piping | Stage: | Low Bids Announced |
| Work Type: | Alteration | Bid Date: | 2009-08-18 |
| Last Updated: | 2009-09-01 | ||
Project Description
Water Piping,Sewage Piping 2009 SRF Sewer Rehabilitation Phase 1. The Project consists of four (4) separate contract schedules that include the following major components: Approximately 6,000 linear feet of cured-in-place lining for sewer piping in various sizes from 10-inch to 21-inch. Approximately 3,400 linear feet of HDPE pipe-bursting for 10-inch and 12-inch sewer piping. Approximately 240 sewer service line replacements, approximately 215 point repairs to sewer piping in various sizes from 8-inch to 15-inch, and approximately 800 feet of sewer line replacement for various sizes from 8-inch to 15-inch. Approximately 1,765 vertical feet of manhole rehabilitation.
Project Value
| Estimated Value: | $1,005,120 |
Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.
Register for a 7 day free trial of Means Costworks now!

