TROOST BUS RAPID TRANSIT

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.
Want more project leads like this?
Learn about getting project leads from Reed Construction DataProject Overview
| Location: | Jackson County, Missouri | Phase: | Post-Bid Phase |
| Building Type: | Transportation Terminals | Stage: | Low Bids Announced |
| Work Type: | Alteration | Bid Date: | 2009-08-25 |
| Last Updated: | 2009-09-05 | ||
Project Description
Transportation Terminal Troost Bus Rapid Transit ¨C MAX Shelter and Marker Fabrication. Work includes fabrication and installation of thirty-six (36) BRT Shelters and thirty-seven (37) existing markers. Additional work includes modification of seven (7) existing markers. Shelters are nominally 24¡¯ long x 8¡± wide x 9¡¯ tall fabricated as a single unit. Primary materials include painted steel, clear acrylic panels and LED lighting. Markers are nominally 18¡¯ tall x 3¡¯ wide x 15¡¯ deep and fabricated as a single unit. Primary materials include galvanized steel, stainless steel, acrylic panels, LED lighting and electrical controls. Bid Details : Troost Bd Transit MAX Shelter and Marker Fabrication (pdf)
Project Value
| Estimated Value: | $3,430,400 |
Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.
Register for a 7 day free trial of Means Costworks now!
Project Participants
CSI Categories Included in Project Scope
The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

