Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News

US flag MOORHEAD SANITARY & FLOOD CONTROL LIFT STATIONS

Project Leads | Construction News & Info
Click here to get general news & information about construction activity in Minnesota
 | Building Codes
Click here to see building codes for Minnesota

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.

Want more project leads like this?

Learn about getting project leads from Reed Construction Data
« Return to Minnesota Project Leads Page »

Project Overview

Location:Clay County, Minnesota Phase:Post-Bid Phase
Building Type:Sewage Treatment Stage:Low Bids Announced
Work Type:AlterationBid Date:2009-10-07
Last Updated:2009-10-14

Project Description

Water Treatment,Sewage Treatment 5 LS Raising Height of Sanitary Lift Stations 3,12,21,22,and 23 to the 500 Year Flood Elevation and Required Modifications 1 LS Modifications to Flood Control Lift Station No. 1 by Replacing the Existing Heavy Duty Steel Gate with a new Stainless Steel Sluice Gate and Providing a Raised Steel Platform for Raising a New Control Panel above the 500 Year Flood Elevation 1 LS Raise Existing Cast-In-Place Concrete Flood Control Lift Station No. 4 to the 500 Year Flood Elevation and Replace Vertical Pumps and Required Modifications Together with fittings,miscellaneous utility improvements,restoration work,and other related appurtenances.

Project Value

Estimated Value:$610,972

Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.

Register for a 7 day free trial of Means Costworks now!

Project Participants

Project Owner
Architects and Engineers
Project Construction

CSI Categories Included in Project Scope

The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

Reed’s data collection and reporting resources are up by 40%!

Learn more!


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.