NORTH DAKOTA NATIONAL GUARD FIRE STATION

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.
Want more project leads like this?
Learn about getting project leads from Reed Construction DataProject Overview
| Location: | Cass County, North Dakota | Phase: | Bid Phase |
| Building Type: | Fire Station, Police Station | Stage: | Biddate Set |
| Work Type: | New | Bid Date: | 2009-10-29 |
| Last Updated: | 2009-10-17 | ||
Project Description
Fire Station Concrete Foundation,Other Structural Frame,Brick Exterior,Metal Deck Roof Structure,Metal Roof Deck,Other Roof Type Base Fire Station Metal Building & Roof Construct FIRE CRASH AND RESCUE STATION, KKGA029115, at Hector IAP, Fargo, ND. The project consists of furnishing all labor, material, equipment, services, and supplies required to complete the work, which includes, but is not limited to, the following principal items: Construction of the Fire Crash and Rescue Station, consisting of a multi-story building of approximately 22,400 square feet for emergency aircraft crash/rescue and firefighting operations to include administrative functions, training and storage associated with fire crash and rescue station. Replace Fire Crash and Rescue Station at the North Dakota Air National Guard, Hector IAP, Fargo, ND. Site work consists of clearing, stripping, excavating, grading, filling, backfilling, seeding, sodding, flexible and rigid paving, curb and gutters, concrete walks, underground utilities, site structures, signage and other related work. Building structure consists of spread footings, reinforced concrete foundation walls, concrete block bearing walls, steel bar joist and metal roof deck, a fully adhered EPDM roofing membrane and rigid insulation system and a standing seam metal roof. Exterior cavity walls consist of face brick and rock faced block units, rigid insulation core and interior concrete block backup, and other related work. Interior finishes include sealed concrete floors, carpeting, vinyl composition tile, porcelain tile, glazed masonry units, burnished block units, dry wall systems, paint, acoustic tile ceiling and other related items. Mechanical work includes heating, ventilating and air conditioning, plumbing, building drainage, fire protection systems, and other related work. Equipment includes engine exhaust removal system and other related work. Electrical work includes primary and secondary power distribution systems, interior and exterior lighting, power and controllers for mechanical systems, fire alarm system, voice data and paging communications systems, fiber optic cable from Building 542 to new facility and other related work.
Project Value
| Estimated Value: | $4,500,000 |
Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.
Register for a 7 day free trial of Means Costworks now!
Project Participants
CSI Categories Included in Project Scope
The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

