FSP SALMON CHALLIS NATIONAL FOREST BRIDGE REPLACEMENTS

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.
Want more project leads like this?
Learn about getting project leads from Reed Construction DataProject Overview
| Location: | Lemhi County, Idaho | Phase: | Bid Phase |
| Building Type: | Bridge & Culvert | Stage: | Biddate Set |
| Work Type: | Alteration | Bid Date: | 2009-11-03 |
| Last Updated: | 2009-10-23 | ||
Project Description
Bridge[s] & Culvert[s] The proposed project is to design and construct replacements for three deficient bridges. Pine Creek Bridge over the Salmon River, Milepost 20.4 (existing bridge is 165 feet long), Little Pine Creek Bridge over Pine Creek, Milepost 20.5 (existing bridge is approximately 20 feet long), Cove Creek Bridge over the Salmon River, Milepost 28.3 (existing bridge is 195 feet long), and Construct or reconstruct bridge approaches. The roadway approaches are up to 1,575 feet long and may include both cut and fill retaining walls. Access to the sites is from Forest Road 6030 (turn off US HWY 93, Milepost 0.0, at North Fork, ID).
Project Value
| Estimated Value: | $6,500,000 |
Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.
Register for a 7 day free trial of Means Costworks now!
Project Participants
CSI Categories Included in Project Scope
The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

