Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News

US flag PANAMA CITY BEACH ADVANCED WWTP

Project Leads | Construction News & Info
Click here to get general news & information about construction activity in Florida
 | Building Codes
Click here to see building codes for Florida

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.

Want more project leads like this?

Learn about getting project leads from Reed Construction Data
« Return to Florida Project Leads Page »

Project Overview

Location:Bay County, Florida Phase:Bid Phase
Building Type:Sewage Treatment Stage:Biddate Set
Work Type:AlterationBid Date:2009-11-04
Last Updated:2009-10-24

Project Description

Water Treatment,Water Piping,Sewage Piping,Sewage Treatment Expansion of the existing wastewater treatment plant from 10 mgd to 14 mgd MMADF. Construction includes replacement of two drum screen units addition of a pump and the rehabilitation of an influent pump station modifications of four (4) biological nutrient removal (BNR) units partial replacement of the RAS/WAS/scum pumping one new ABW filter (or multiple disk filter replacement Alternate Bid) modifications of the existing post aeration/chlorine contact basins chemical feed and storage facilities addition of a reject storage pond with a reject drain pump station addition of an aerobic digester replacement of the digested sludge transfer pumps replacement of two (2) dewatering belt filter presses addition of utility parts and trailer-mounted equipment storage buildings and a belt press operator room modification of former gas chlorination building minor modifications to existing four (4) aerobic digesters cleaning and painting of soda ash silo cleaning and painting of ceiling and ceiling joist system in the existing blower room addition of a fuel storage and dispensing facility electrical and instrumentations and SCADA upgrade addition of two (2) new emergency generators four (4) new motor control center buildings additional service entrance switch gear fencing gates security camera system site work meters composite samplers piping and valves and related facilities and miscellaneous appurtenances.

Project Value

Estimated Value:$17,000,000

Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.

Register for a 7 day free trial of Means Costworks now!

Project Participants

Project Owner
Architects and Engineers
   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

How BIM could impact your business? The BIM Handbook can help.

Learn how!


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.