Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News

US flag CANAAN VALLEY WASTEWATER COLLECTION SYSTEM CONTRACT 2

Project Leads | Construction News & Info
Click here to get general news & information about construction activity in West Virginia
 | Building Codes
Click here to see building codes for West Virginia

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.

Want more project leads like this?

Learn about getting project leads from Reed Construction Data
« Return to West Virginia Project Leads Page »

Project Overview

Location:Tucker County, West Virginia Phase:Bid Phase
Building Type:Sewage Treatment Stage:Biddate Set
Work Type:AlterationBid Date:2009-11-19
Last Updated:2009-11-10

Project Description

Water Treatment,Sewage Treatment The approximate quantities of work to be bid upon is described as follows: Installation of gravity sewer lines, pumping systems and force mains as an extension to the Canaan Valley Public Service District sanitary sewer system. Proposed work generally includes, 1,045 LF 8 PVC gravity sewer line, 1,825 LF 4 PVC C-900 DR 18 force main, 7,770 LF 3 PVC SDR 17 class 250 force main, 525 LF 2 PVC SDR 17 class 250 force main, 10 EA 48 sanitary manholes, 680 LF various size steel casing bore and jack, 550 LF 3 HDPE directional drill force main, 670 LF WVDOH type C trench repair, 90 CY 2 gravel drive overlay, 1 LS Black Bear pump station, 1 LS Beaver Ridge Pump Station, 1 LS North Lake pump station, 1 LS North Lake Pump Station Access Road Construction, 78 CY 4 of 1 1/2 crusher run stone (North Lake access road), 3 EA pad mounted electrical transformers for each pump station, 7 EA combination air/vac release valve at High Point, 3 EA pressure inline cleanout, 1 EA connection to existing manhole, 3 EA tie into existing force main, 1 EA tie into existing communication line, 3 EA cut and plug existing 8 PVC gravity sewer, 100 LF erosion control 12 rip-rap, 3 EA concrete anchor, 10,250 LF reclamation of disturbed areas, 42 EA utility line locator, and miscellaneous appurtenances.

Project Value

Estimated Value:$1,200,000

Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.

Register for a 7 day free trial of Means Costworks now!

Project Participants

Project Owner
Architects and Engineers

CSI Categories Included in Project Scope

The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

Reed’s data collection and reporting resources are up by 40%!

Learn more!


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.