| Location: | Box Elder County, Utah | Phase: | Post-Bid Phase |
| Building Type: | Road | Stage: | Low Bids Announced |
| Work Type: | Alteration | Bid Date: | 2009-10-20 |
| Last Updated: | 2009-10-30 | ||
Project Description
Road[s],Sidewalk[s], Curb[s], Gutter[s] Construction of approximately 768 lf of curb, gutter, sidewalk, and drive approaches, 784 lf of 18 HDPE or PVC, 125 lf of 15 HDPE or PVC and associated roadway (FDR) full depth reclamation of asphalt pavement. Said work will be entirely within 2000 South between 100 West and 370 West.
Project Value
| Estimated Value: | $220,240 |
Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.