Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News

US flag ORDOT I 84 ASPHALT

Project Leads | Construction News & Info
Click here to get general news & information about construction activity in Oregon
 | Building Codes
Click here to see building codes for Oregon

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.

Want more project leads like this?

Learn about getting project leads from Reed Construction Data
« Return to Oregon Project Leads Page »

Project Overview

Location:Hood River County, Oregon Phase:Post-Bid Phase
Building Type:Road Stage:Low Bids Announced
Work Type:AlterationBid Date:2009-10-29
Last Updated:2009-11-12

Project Description

Road[s] Req. approx. 1,866 hrs. training; 2,500 ft2 temp. signs; 6,850 ft temp. conc. barr.; 6 ea. temp. impact atten.; 81,363 ft temp. striping; 37,504 ft stripe rem.; temp. traf. signal; 2 ea. seq. arrow signs; 5 ea. PCMS; 4,300 hr flaggers; 500 ea. TCS; const. & rem. detours; temp. drainage facil.; temp. det. bridges; eros. cntrl.; 14.4 ton haz. mat. disposal; const. survey wk.; rem. struct. & obstr.; rem. barr.; rem. pvmt.; 12,822 ft asph. pvmt. saw cutting; rem. extg. lift sta.; 4.75 ac. clr. & grub.; 18,500 yd3 gen. exc.; 1,000 yd3 stone emb.; 3,990 yd3 extra for sel. topsoil matl.; 3,118 yd2 subgr. stab.; 3,448 ft storm sew. pipe; 4 ea. conc. manholes;35 ea. conc. inlets; stormwater lift station; br. rem. work; shor., crib. & cofferdams; 1,400 yd3 struct. exc.; 4,100 ft stl. piles; 243,000 lb.reinf. (78,000 coated); 260 yd3 fdn. conc.; 380 yd3 deck conc.; 385 yd3 struct. conc.; 576 yd2 end panels; 350,000 lb. stl. box girder; 323 ft conc. rail; conc. parapet; 1,730 ft2 MSE wall; 7,700 yd2 cold pl. pvmt. rem.; 7,000 ton agg. base (950 ton in temp.); 22 ton tack coat; 9,900 ton HMAC; 600 ton PG 70-28 asph.; 1,642 ft conc. curb; 7,492 ft conc. walks; 14 ea. conc. sidewalk ramps; 1,792 ft stl. gd. rl.; 3,237 ft conc. barr.; 32,285 ft pvmt. marking tape; rem & reinst. cantil. sign struct.; 2,811 lb sign supports; 625 ft2 signs in pl.; 150 ft 42-inch drilled shaft; traf. signal installations; interconn. syst.; 2.1 ac seeding; 1,250 yd3 soil cond.; 60 ea. trees; 5,224 ea. shrubs; 397 yd3 bark mulch; reused river rock.

Project Value

Estimated Value:$7,131,960

Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.

Register for a 7 day free trial of Means Costworks now!

Project Participants

Project Owner
   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

There are over 100,000 companies profiled in SmartBuilding Index.

Is yours?


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.