WHEAT RIDGE 38TH AVENUE & KIPLING STREET PARK

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.
Want more project leads like this?
Learn about getting project leads from Reed Construction DataProject Overview
| Location: | Jefferson County, Colorado | Phase: | Post-Bid Phase |
| Building Type: | Sidewalk, Curb & Gutter | Stage: | Low Bids Announced |
| Work Type: | Alteration | Bid Date: | 2009-10-26 |
| Last Updated: | 2009-11-05 | ||
Project Description
Park[s], Landscaping,Road[s],Sidewalk[s], Curb[s], Gutter[s],Water Piping,Electrical Work,Sewage Piping 38TH AND KIPLING PARK; 8,400 CY of earthwork plus 4,500 CY imported fill; 42,000 SF 6 depth concrete walk and flatwork; 19,500 SF asphalt parking lot with curb and gutter; 1,200 LF additional curb and gutter roadway improvements; utility improvements including water service, storm sewer, sanitary sewer, and piping an existing irrigation ditch; (3) age separated playground pits with play equipment; picnic shelters; new 280,000 SF irrigation system; new site electrical service and fixtures
Project Value
| Estimated Value: | $1,299,020 |
Need a more accurate cost estimate? Means Costworks offers online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.
Register for a 7 day free trial of Means Costworks now!
Project Participants
CSI Categories Included in Project Scope
The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

