WYDOT DISTRICT 3 CHIP SEAL

This project lead is pulled from our database of hundreds of thousands of construction projects and is offered free of charge to our community members.
Want more project leads like this?
Learn about getting project leads from Reed Construction DataProject Overview
| Location: | Lincoln County, Wyoming | Phase: | Bid Phase |
| Building Type: | Road | Stage: | Biddate Set |
| Work Type: | Alteration | Bid Date: | 2009-11-13 |
| Last Updated: | 2009-10-31 | ||
Project Description
Road[s] chip sealing and miscellaneous work on 113.41 miles at various locations in Transportation District 3. 5-ROADWAY Master Project:STP-B103005 1 106.05100 FIELD LABORATORY 1.00 EA 2 106.05200 CONTRACTOR TESTING 1.00 LS 3 109.04000 FORCE ACCOUNT WORK 900.00 $$ 4 109.08000 MOBILIZATION 1.00 LS 5 215.01000 CONTRACTOR STORM WATER CONTROL 1.00 LS 6 409.02100 FOG SEAL 146.00 TON 7 409.03070 CHIP SEAL 966460.00 SY 8 409.03075 CHIP SEAL(OVERSHOOT)669510.00 SY 9 409.03080 EMULSIFIED ASPHALT 1600.00 TON 10 409.03085 EMULSIFIED ASPHALT MODIFIED 1115.00 TON 11 409.03090 EMULSIFIED ASPHALT OVERSHOOT 205.00 TON 12 703.03100 FLAGGING 1370.00 HR 97-TRAFFIC CONTROL Description:TRAFFIC ITEMS(OPTION)Alt Group:1 Alt # 1 Master Project:STP-B103005 13 703.01000 CATEGORY I TCD UNITS 10100.00 EA 14 703.01003 CATEGORY III TCD UNITS 1830.00 EA 15 703.01004 CATEGORY IV TCD UNITS 45800.00 EA 16 703.01005 CATEGORY V TCD UNITS 12800.00 EA 97-TRAFFIC CONTROL Description:TEMPORARY TRAFFIC CONTROL(OPTION)Alt Group:1 Alt # 2 Master Project:STP-B103005 17 703.03115 TEMPORARY TRAFFIC CONTROL(OPTION)1.00 LS 18 106.05200 CONTRACTOR TESTING 1.00 LS 19 109.04000 FORCE ACCOUNT WORK 100.00 $$ 20 109.08000 MOBILIZATION 1.00 LS 21 215.01000 CONTRACTOR STORM WATER CONTROL 1.00 LS 22 409.02100 FOG SEAL 15.00 TON 23 409.03070 CHIP SEAL 150300.00 SY 24 409.03080 EMULSIFIED ASPHALT 250.00 TON 25 703.03100 FLAGGING 130.00 HR 97-TRAFFIC CONTROL Description:TRAFFIC ITEMS(OPTION)Alt Group:1 Alt # 1 Subproject:CMP-PM-B103022 26 703.01000 CATEGORY I TCD UNITS 900.00 EA 27 703.01003 CATEGORY III TCD UNITS 170.00 EA 28 703.01004 CATEGORY IV TCD UNITS 4200.00 EA 29 703.01005 CATEGORY V TCD UNITS 1200.00 EA 97-TRAFFIC CONTROL 30 703.03115 TEMPORARY TRAFFIC CONTROL(OPTION)1.00 LS 31 106.05200 CONTRACTOR TESTING 1.00 LS 32 109.08000 MOBILIZATION 1.00 LS 33 215.01000 CONTRACTOR STORM WATER CONTROL 1.00 LS 34 409.03070 CHIP SEAL 60150.00 SY 35 409.03080 EMULSIFIED ASPHALT 100.00 TON 36 703.03100 FLAGGING 50.00 HR 97-TRAFFIC CONTROL Description:TRAFFIC ITEMS(OPTION)Alt Group:1 Alt # 1 Subproject:ARSCT-B103A01 37 703.01000 CATEGORY I TCD UNITS 400.00 EA 38 703.01003 CATEGORY III TCD UNITS 70.00 EA 39 703.01004 CATEGORY IV TCD UNITS 1750.00 EA 40 703.01005 CATEGORY V TCD UNITS 500.00 EA 97-TRAFFIC CONTROL Description:TEMPORARY TRAFFIC CONTROL(OPTION)Alt Group:1 Alt # 2 Subproject:ARSCT-B103A01 41 703.03115 TEMPORARY TRAFFIC CONTROL(OPTION)1.00 LS
Project Participants
CSI Categories Included in Project Scope
The following product types are being used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

