| Details: | Automotive Maintenance, Storage Paratransit Facility Phase 2, Pm&E Project No. 05-01 Consisting Of Remodeling The Existing Maintenance Bays And Wash Bay Facility Of Approximately 20,698 Sq. Ft. The Project Includes Mechanical Ventilation And Exhaust System Replacement, Light Fixture Replacement, Door Replacement, Removal Of A Concrete Service Pit And Recessed Vehicle Lift, Hazmat Abatement, A New Structural Opening In 12 Inch Cmu Wall, Cleaning And Repainting Of Cmu Walls, Concrete Slabs, Trench Drain Work, Relocation Of Existing Maintenance Equipment And Vehicle Lifts From Another Facility. Additive Alternate No. 1: Consists Of Replacement Of An Existing Oil Water Separator. Additive Alternate No. 2: Consists Of Extending New Mechanical, Electrical And Painting Work Into The Existing Vehicle Storage Bay (Approximately 4.450 Sq. Ft.) And Painting Of All Ceiling Areas Of Maintenance Bays, Wash Bay And Storage Bay. |