Who We Are US Canada Management Partners Careers Advertising/Media Kits Press Releases Announcements Reed In The News
Construction Project Leads SmartBIM RSMeans Market Analytics Building Product Information Promote Your Business Associated Construction Pubs Daily Commercial News Journal of Commerce
Connections SmartBIM accessArchitecture RSMeanies Market Insights Green Construction
Building Products Construction Projects Building Codes Companies RSS Feeds eNewsletters Blogs Forums
Upload Plans & Specs
home « smartbuilding index « united states « montana « top projects

GOODAN-KEIL CO WATER SYSTEM IMPROVEMENTS

SmartBuilding Index Sample Montana Projects

Post Bid Stage

Project Location

  • State/Province: Montana
  • County: Ravalli
Project#:1000850350
Updated:2008-06-13
Work Type:Alteration
Building Type:Water & Sewage Piping
Value:$0
Project Phase:Post-Bid
Stage:Low Bids Announced
Bid Date:2008-06-04
Civil Engineer:ANDERSON MONTGOMERY CONSULTING ENG - MT
Owner:GOODAN-KEIL WATER DISTRICT - MT
Details:Water Piping, Sewage Piping Goodan-Keil County Water District Water System Improvements 1. Bid Schedule I: Open Trench Installation Of Approximately 275 Lineal Feet Of 2 , 3 And 4 Diameter Water Pipe And Associated Fittings And Valves At The Well Field. Installation Of Approximately 2,135 Lineal Feet Of 6 Diameter Ductile Iron And PVC Water Supply Piping, Including 360 Lineal Feet Of Restrained-Joint DIP Within An Existing 12 Diameter PVC Casing Pipe Beneath Interstate 90. Installation Of A Pressure Relief Station And Structure. Installation Of Approximately 700 Lineal Feet Of 6 Diameter C900 Supply, Distribution, And Overflow Pipe At The Storage Tank Site, With All Associated Fittings, Valves, Structures And Equipment. All Necessary Excavation And Site Preparation For The Water Storage Tank. Installation Of 7 New Fire Hydrants, And Associated Piping, Valves And Fittings. Installation Of Check Valves At Three Wells. Improvement/Construction Of Approximately 1,000 Lineal Feet Of 12'-Wide, Gravel Access Road To The Tank Site. Installation Of Approximately 400 Lineal Feet Of 6' Chain Link Fence And Gate. 2. Bid Schedule II: Construction Of A 150,000-Gallon Concrete Or Steel Water Storage Tank And All Associated Piping, Valves, Fittings, Vents, Drains, Coatings And Appurtenant Work. Level-Control Telemetry System At The Storage Tank, Transducer, Electrical And Integration Into The Existing Well And Booster Station Control System. 3. Bid Schedule III: Purchase Of 61 - 3/4 X 5/8 Radio-Read Equipped Water Meters, 20 Radio-Read Meter Retro-Fit Units, Hand-Held Radio-Read Equipment And Compatible Reading/Billing Software. 4. Additive Alternate #1: Construction Of Approximately 2,600 Lineal Feet Of 6 Diameter C900 PVC Supply Pipe From The Booster Station To The Storage Tank, Including All Associated Fittings, Valves, Structures And Equipment.

Want more project leads like this?

Learn about getting project leads from Reed Construction Data
   Community Login | Register

Search SmartBuilding Index

Recent News

E Newsletter

Did You Know?

Click here for more information.


Resource Center

© 2008 Reed Construction Data Inc. All rights reserved.