Post Bid Stage
Project Location
- State/Province: Montana
- County: Ravalli
|
| Project#: | 1000850350 |
| Updated: | 2008-06-13 |
| Work Type: | Alteration |
| Building Type: | Water & Sewage Piping |
| Value: | $0 |
| Project Phase: | Post-Bid |
| Stage: | Low Bids Announced |
| Bid Date: | 2008-06-04 | | Civil Engineer: | ANDERSON MONTGOMERY CONSULTING ENG - MT | | Owner: | GOODAN-KEIL WATER DISTRICT - MT | | Details: | Water Piping, Sewage Piping Goodan-Keil County Water District Water System Improvements 1. Bid Schedule I: Open Trench Installation Of Approximately 275 Lineal Feet Of 2 , 3 And 4 Diameter Water Pipe And Associated Fittings And Valves At The Well Field. Installation Of Approximately 2,135 Lineal Feet Of 6 Diameter Ductile Iron And PVC Water Supply Piping, Including 360 Lineal Feet Of Restrained-Joint DIP Within An Existing 12 Diameter PVC Casing Pipe Beneath Interstate 90. Installation Of A Pressure Relief Station And Structure. Installation Of Approximately 700 Lineal Feet Of 6 Diameter C900 Supply, Distribution, And Overflow Pipe At The Storage Tank Site, With All Associated Fittings, Valves, Structures And Equipment. All Necessary Excavation And Site Preparation For The Water Storage Tank. Installation Of 7 New Fire Hydrants, And Associated Piping, Valves And Fittings. Installation Of Check Valves At Three Wells. Improvement/Construction Of Approximately 1,000 Lineal Feet Of 12'-Wide, Gravel Access Road To The Tank Site. Installation Of Approximately 400 Lineal Feet Of 6' Chain Link Fence And Gate. 2. Bid Schedule II: Construction Of A 150,000-Gallon Concrete Or Steel Water Storage Tank And All Associated Piping, Valves, Fittings, Vents, Drains, Coatings And Appurtenant Work. Level-Control Telemetry System At The Storage Tank, Transducer, Electrical And Integration Into The Existing Well And Booster Station Control System. 3. Bid Schedule III: Purchase Of 61 - 3/4 X 5/8 Radio-Read Equipped Water Meters, 20 Radio-Read Meter Retro-Fit Units, Hand-Held Radio-Read Equipment And Compatible Reading/Billing Software. 4. Additive Alternate #1: Construction Of Approximately 2,600 Lineal Feet Of 6 Diameter C900 PVC Supply Pipe From The Booster Station To The Storage Tank, Including All Associated Fittings, Valves, Structures And Equipment. |
|