| Details: | Main Pool: Renovations To The Existing 50 Meter L Shaped Pool By Removing The Existing Decks, Fences, Filtration System, Concrete Gutters & Deck Equipment & Installing New Decks, Fences, Deck Equipment, A 1500 Gallons Per Minute Filtration System, New Stainless Steel Gutters, New PVC Pool Membrane, Addition Of 2 Family Change Rooms, New Plumbing Fixtures, A New Domestic Hot Water System & All Miscellaneous & Incidental Items Necessary Thereto For A Complete Installation, Aquatics Complex: Construction Of A New 20'x36' CMU Filtration Building, A New Shotcrete Swim Channel With A Zero Depth Entry Plunge Pool (5300 Square Feet), A New Dual Flume 22' High Water Slide, New Filtration & Chemical Feed Systems, New Concrete Deck, Deck Drains, Fencing, A New 2300 Square Feet Splash Deck With 5 Features, A Storage Tank, Recirculation Filter & Chemical Feed System, & The Relocation Of 150 Lf Of Sewer Main & 275 Feet Of Water Line & All Miscellaneous & Incidental Items Necessary Thereto For A Complete Installation |