| Details: | Water Treatment Project scope will include the following: Clearwell, two bays, each with a nominal capacity of 1.5 million gallons; building and wetwell, including the following major equipment: - Three high service pumps (1250 HP); - Two low service pumps (40 HP); - One backwash pump (300 HP); - Two hydro-pneumatic surge tanks; Electrical switchgear building and equipment; Site work including: - Excavation and finish grading; - Access roads; - Site piping ranging from 72 to less than 6 pipe; - Drainage improvements; - Seeding as needed for erosion control; Process instrumentation and control systems; Standby power system including one generator set with capacity of approximately 2 MW; and Clean up, startup services, and all other miscellaneous work. |