| Details: | Warehouse, Governmental Office[s] Concrete Slab On Grade Foundation, Structural Steel Frame, Metal Panel Exterior The project consists of major renovations of an approximately 9,000 sq ft office/warehouse, and new construction of a 15,000 sq ft maintenance building, a 3,900 sq ft wash building and a 3,200 sq ft clean building. This project has been designed to be LEED Gold. Scope of work for this project includes, but is not limited to: sitework package, selective demolition & asbestos abatement, unit pavers, high tension cable barrier and steel mesh fence system, landscaping, cast-in-place concrete, masonry, structural steel, cold formed metal framing, miscellaneous and ornamental metals, rough carpentry, interior architectural woodworking, dampproofing, waterproofing, metal wall panels TPO Roofing, mineral fiber cement siding, firestopping, joint sealants, doors/frames/hardware, overhead coiling doors, overhead coiling grilles, hangar doors, sectional overhead doors, glass and glazing, aluminum storefront, aluminum windows, roof windows, unit skylights, plastic glazing, gypsum board systems, ceramic tile, acoustical ceilings, resilient flooring & base, carpet tiles, painting, toilet compartments, louvers and vents, signage, metal lockers, fire extinguishers, postal specialties, wire mesh partitions, operable panel partitions, exterior sun control devices, toilet and bath accessories, vacuum cleaning equipment, dust collectors, projection screens, service station equipment, parking control equipment, shop equipment, fare collection equipment, vehicle washing equipment, foot grilles, metal bus canopies, lubrication equipment, fuel dispensers submersible fuel pumps, fiberglass underground storage tanks, site access control system, cranes, vehicle lifts, fire alarm, plumbing & mechanical systems, fire sprinkler, electrical and automatic control systems |