| Details: | Gym & Athletic Building, Community Center, Swimming Pool Activity, Athletic Training, Closet, Communications, Dressing/Changing, Equipment Storage, Locker Room, Office[s], Recreation, Restroom, Shower, Storage, Swimming Pool, Vehicle Parking Other Foundation, CMU Block Structural Frame, Other Structural Frame, Brick Veneer Exterior, Steel Joist Roof Structure, Metal Roof Deck, Built Up Roof Other Foundation = Concrete Grade Beams, Other Structural Frame = Pre-Cast Concrete Wall Panels (Pool Area) To Be Built On The Summit Lakes Middle School Campus |