Post Bid Stage
Project Location
- State/Province: Louisiana
- County: Plaquemines
|
| Project#: | 1000900109 |
| Updated: | 2008-08-29 |
| Work Type: | Alteration |
| Building Type: | Demolition; Jr, Sr High Schools |
| Value: | $500,000 |
| Project Phase: | Post-Bid |
| Stage: | Post Bid Results Pending |
| Bid Date: | 2008-08-28 | | Blue Printer: | AEPLANS, LLC - LA | | Architect: | GOSSEN HOLLOWAY ARCHITECTS - LA | | Owner: | PLAQUEMINES PARISH SCHOOL BOARD - LA | | Details: | Demolition And Removal Of All Of The Existing Buildings And Associated Systems, Including But Not Limited To, Walls, Roofs, Structural Framing Foundations, Concrete Footings, Pile Caps, And Grade Beams. Backfilling Of All Excavations Resulting From Building, Foundation And 36" Of Piling Removal. (36" Of Each Pile Shall Be Cut And Removed From The Site.) Excavation And Removal Of All Plumbing Piping, Conduits, Wiring, Including But Not Limited To All Underground Utilities At The Project Site. All Other Subsurface Utilities Found At The Building Perimeter Shall Be Removed To The Property Line Unless Otherwise Noted On The Drawings Along With Backfilling The Excavations With The Fill Material Specified. Removal Of All Site Features Including Sidewalks, Equipment Pads, Fences, Lawns, Subsurface Drainage, Site Lighting And Light Pole Base Foundation, Goal Posts, And All Other Items Indicated In The Drawings To Be Removed And Hauled Away From Site, Unless Specifically Noted As Existing To Remain. (Example: Communication Tower Shall Remain And Be Protected From Any Interruption Of Power. The Existing Tower Shall Be Enclosed By A 6' Safety/Security Fence.) |
|