| Details: | Sewage Treatment The Project Consist Of A New 2.0-Mgd (Ave. Day) Water Pollution Control Facility, A Remote 8.00Mgd (Peak) Pump Station, And Associated Force Mains. The Upper Hocking Water Pollution Control Facility Will Be Located At 1442 Camp Ground Road And Will Generally Consist Of Influent Screening, Flow Equalization, Oxidation Ditches And Membrane Bioreactors For Biological Treatment, Chemical Phosphorous Removal, Uv Disinfection, And Sludge Processing And Dewatering. A 36-Inch Diameter Line Will Discharge Effluent To The Hocking River. The Upper Hocking Pump Station Will Be Located At 1155 North Pierce Avenue And Will Discharge Through A 14-Inch Force Main And An 18-Inch Force Main, Each Being Approximately 14,000 Feet Long, To The Upper Hocking Water Pollution Control Facility. Separate Bids Will Be Received On Contract No. 1G-General, Contract No. 1H-Hvac, Contract No. 1P-Plumbing, And Contract No. 1E-Electrical. |