Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News

Estimating Tips for Structural Metal Framing

RSMeans Cost Estimating

Steel items can be obtained from two sources: a fabrication shop or a metals service center. Fabrication shops can fabricate items under more controlled conditions than can crews in the field. They are also more efficient and can produce items more economically. Metal service centers serve as a source of long mill shapes to both fabrication shops and contractors. Most RSMeans line items for structural steel items as indicated as shop fabricated. RSMeans line items for most structual steel divisions are assumed to be shop fabricated, with the exception of subdivision 05 12 23.40 (Lightweight Framing) which are indicated as being field fabricated.

Plates and Connections - When estimating the total tonnage of structural steel, add 10% to the total weight to allow for plates, connections, and waste as a rule of thumb.

Shop-Applied Finish Paint - When the specifications call for the finish coat of paint to be applied prior to installation, allow considerable time for touching up the paint. Every time you lift, move, weld, bolt, or alter the position of a piece of steel, you will need to touch up the finish.

Joist Spacings - It is possible to lower overall costs for steel joist-type construction by having greater spacing between joists. The economies of needing fewer joists can well offset the costs of the larger or heavier joists that may be required to replace them.

Joist Bridging - It generally costs less to install joist systems that can utilize horizontal bridging (as opposed to cross or other types of bridging).

Other items that should be added to the estimate:

  • Material costs for structural bolts and welding rods
  • Drilling into concrete and fasteners to fasten field items fabricated to other work

Read more metals estimating tips.

Get a FREE 7 day trial to Means CostWorks!

Get online access to the entire RSMeans database of unit costs, assemblies, repair and remodeling costs, covering every major category of construction.

Register for your 7 day free trial now!

   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

Reed’s data collection and reporting resources are up by 40%!

Learn more!


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.