Construction Cost Estimates for College Dormitory (2-3 Story) in National, US

The following analysis estimates the cost to build a college dormitory (2-3 story) using US National Average costs from 2013 RSMeans cost data. Costs are derived from a building model that assumes basic components, using union labor for a 25000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a college dormitory (2-3 story) in a specific city or metropolitan area, go to our index of college dormitory (2-3 story) models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

College Dormitory (2-3 Story) Construction Cost Assumptions
Location: US National Average
Stories: 3
Story Height (L.F.): 12.00
Floor Area (S.F.): 25000
Basement Included: No
Data Release: Year 2013

College Dormitory (2-3 Story) Square Foot Cost Assuming Decorative Concrete Block / R/Conc. Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $143.06 $3,576,500
Contractor Fees (GC,Overhead,Profit) 25% $35.77 $894,100
Architectural Fees 7% $12.52 $312,900
Total Building Cost $191.34 $4,783,600
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $131.64 $3,291,000
Contractor Fees (GC,Overhead,Profit) 25% $32.91 $822,800
Architectural Fees 7% $11.52 $288,000
Total Building Cost $176.07 $4,401,700

College Dormitory (2-3 Story) Square Foot Cost Assuming Decorative Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

College Dormitory (2-3 Story) Square Foot Cost Assuming Face Brick with Concrete Block Back-up / R/Conc. Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

College Dormitory (2-3 Story) Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

College Dormitory (2-3 Story) Square Foot Cost Assuming Precast Concrete Panels / R/Conc. Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

College Dormitory (2-3 Story) Square Foot Cost Assuming Precast Concrete Panels / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--