Construction Cost Estimates for College Laboratory in Bloomington, Indiana

The following analysis estimates the cost to build a college laboratory for Bloomington, Indiana. Costs are derived from a building model that assumes basic components, using union labor for a 45000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a college laboratory in a different city or metropolitan area, go to our index of college laboratory models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

College Laboratory Construction Cost Assumptions
Location: Bloomington, Indiana
Stories: 1
Story Height (L.F.): 12.00
Floor Area (S.F.): 45000
Basement Included: No
Data Release: Year 2013

College Laboratory Square Foot Cost Assuming Decorative Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $132.35 $5,955,800
Contractor Fees (GC,Overhead,Profit) 25% $33.09 $1,489,000
Architectural Fees 10% $16.54 $744,500
Total Building Cost $181.98 $8,189,200
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $121.61 $5,472,500
Contractor Fees (GC,Overhead,Profit) 25% $30.40 $1,368,100
Architectural Fees 10% $15.20 $684,100
Total Building Cost $167.21 $7,524,600

College Laboratory Square Foot Cost Assuming Decorative Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

College Laboratory Square Foot Cost Assuming Face Brick with Concrete Brick Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

College Laboratory Square Foot Cost Assuming Face Brick with Concrete Brick Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

College Laboratory Square Foot Cost Assuming Stucco on Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

College Laboratory Square Foot Cost Assuming Stucco on Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--