Construction Cost Estimates for Computer Data Center in Yellowknife, Northwest Territories
The following analysis estimates the cost to build a computer data center for Yellowknife, Northwest Territories. Costs are derived from a building model that assumes basic components, using union labor for a 22500 square foot building.
Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a computer data center in a different city or metropolitan area, go to our index of computer data center models by state.
NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.
Computer Data Center Construction Cost Assumptions
Location:
Yellowknife, Northwest Territories
Stories:
1
Story Height (L.F.):
16.50
Floor Area (S.F.):
22500
Basement Included:
No
Data Release:
Year 2013
Computer Data Center Square Foot Cost Assuming Brick Veneer / Bearing Wall
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
$250.72
$5,641,200
Contractor Fees (GC,Overhead,Profit)
25%
$62.68
$1,410,300
Architectural Fees
7%
$21.94
$493,600
Total Building Cost
$335.34
$7,545,100
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
$231.45
$5,207,700
Contractor Fees (GC,Overhead,Profit)
25%
$57.86
$1,301,900
Architectural Fees
7%
$20.25
$455,700
Total Building Cost
$309.57
$6,965,300
Computer Data Center Square Foot Cost Assuming Brick Veneer / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Computer Data Center Square Foot Cost Assuming Concrete Panels / Bearing Wall
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Computer Data Center Square Foot Cost Assuming EIFS System on Metal Studs/ Bearing Wall
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Computer Data Center Square Foot Cost Assuming EIFS System on Metal Studs/ Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Computer Data Center Square Foot Cost Assuming Tilt Up Concrete / Steel Frame