Construction Cost Estimates for Elementary School in Waterbury, Connecticut

The following analysis estimates the cost to build an elementary school for Waterbury, Connecticut. Costs are derived from a building model that assumes basic components, using union labor for a 45000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build an elementary school in a different city or metropolitan area, go to our index of elementary school models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

Elementary School Construction Cost Assumptions
Location: Waterbury, Connecticut
Stories: 1
Story Height (L.F.): 15.00
Floor Area (S.F.): 45000
Basement Included: No
Data Release: Year 2013

Elementary School Square Foot Cost Assuming Decorative Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $134.26 $6,041,600
Contractor Fees (GC,Overhead,Profit) 25% $33.56 $1,510,400
Architectural Fees 7% $11.75 $528,600
Total Building Cost $179.57 $8,080,600
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $122.73 $5,522,900
Contractor Fees (GC,Overhead,Profit) 25% $30.68 $1,380,700
Architectural Fees 7% $10.74 $483,300
Total Building Cost $164.15 $7,386,900

Elementary School Square Foot Cost Assuming Decorative Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Elementary School Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Elementary School Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Elementary School Square Foot Cost Assuming Stucco on Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Elementary School Square Foot Cost Assuming Stucco on Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--