Construction Cost Estimates for Factory, 1 Story in Columbia, Missouri

The following analysis estimates the cost to build a factory, 1 story for Columbia, Missouri. Costs are derived from a building model that assumes basic components, using union labor for a 30000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a factory, 1 story in a different city or metropolitan area, go to our index of factory, 1 story models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

Factory, 1 Story Construction Cost Assumptions
Location: Columbia, Missouri
Stories: 1
Story Height (L.F.): 20.00
Floor Area (S.F.): 30000
Basement Included: No
Data Release: Year 2013

Factory, 1 Story Square Foot Cost Assuming Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $87.93 $2,638,000
Contractor Fees (GC,Overhead,Profit) 25% $21.98 $659,500
Architectural Fees 7% $7.69 $230,800
Total Building Cost $117.61 $3,528,300
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $80.85 $2,425,500
Contractor Fees (GC,Overhead,Profit) 25% $20.21 $606,400
Architectural Fees 7% $7.07 $212,200
Total Building Cost $108.14 $3,244,100

Factory, 1 Story Square Foot Cost Assuming Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Factory, 1 Story Square Foot Cost Assuming Face Brick on Common Brick / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Factory, 1 Story Square Foot Cost Assuming Insulated Metal Panels / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Factory, 1 Story Square Foot Cost Assuming Precast Concrete Panels / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Factory, 1 Story Square Foot Cost Assuming Tilt-up Concrete Panel / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--