Construction Cost Estimates for Factory, 3 Story in Orlando, Florida
The following analysis estimates the cost to build a factory, 3 story for Orlando, Florida. Costs are derived from a building model that assumes basic components, using union labor for a 90000 square foot building.
Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a factory, 3 story in a different city or metropolitan area, go to our index of factory, 3 story models by state.
NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.
Factory, 3 Story Construction Cost Assumptions
Location:
Orlando, Florida
Stories:
3
Story Height (L.F.):
12.00
Floor Area (S.F.):
90000
Basement Included:
No
Data Release:
Year 2013
Factory, 3 Story Square Foot Cost Assuming Face Brick Common Brick Back-up / Concrete Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
$88.81
$7,992,900
Contractor Fees (GC,Overhead,Profit)
25%
$22.20
$1,998,200
Architectural Fees
6%
$6.66
$599,500
Total Building Cost
$117.67
$10,590,600
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
$81.32
$7,318,900
Contractor Fees (GC,Overhead,Profit)
25%
$20.33
$1,829,700
Architectural Fees
6%
$6.10
$548,900
Total Building Cost
$107.75
$9,697,500
Factory, 3 Story Square Foot Cost Assuming Face Brick Common Brick Back-up / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Factory, 3 Story Square Foot Cost Assuming Face Brick Concrete Block Back-up / Concrete Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Factory, 3 Story Square Foot Cost Assuming Face Brick Concrete Block Back-up / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Factory, 3 Story Square Foot Cost Assuming Stucco on Concrete Block / Concrete Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Factory, 3 Story Square Foot Cost Assuming Stucco on Concrete Block / Steel Frame