Construction Cost Estimates for Factory, 3 Story in Pulaski, Virginia
The following analysis estimates the cost to build a factory, 3 story for Pulaski, Virginia. Costs are derived from a building model that assumes basic components, using union labor for a 90000 square foot building.
Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a factory, 3 story in a different city or metropolitan area, go to our index of factory, 3 story models by state.
NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.
Factory, 3 Story Construction Cost Assumptions
Location:
Pulaski, Virginia
Stories:
3
Story Height (L.F.):
12.00
Floor Area (S.F.):
90000
Basement Included:
No
Data Release:
Year 2013
Factory, 3 Story Square Foot Cost Assuming Face Brick Common Brick Back-up / Concrete Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
$79.81
$7,182,800
Contractor Fees (GC,Overhead,Profit)
25%
$19.95
$1,795,700
Architectural Fees
6%
$5.99
$538,700
Total Building Cost
$105.75
$9,517,200
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
$73.08
$6,577,100
Contractor Fees (GC,Overhead,Profit)
25%
$18.27
$1,644,300
Architectural Fees
6%
$5.48
$493,300
Total Building Cost
$96.83
$8,714,700
Factory, 3 Story Square Foot Cost Assuming Face Brick Common Brick Back-up / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Factory, 3 Story Square Foot Cost Assuming Face Brick Concrete Block Back-up / Concrete Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Factory, 3 Story Square Foot Cost Assuming Face Brick Concrete Block Back-up / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Factory, 3 Story Square Foot Cost Assuming Stucco on Concrete Block / Concrete Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Factory, 3 Story Square Foot Cost Assuming Stucco on Concrete Block / Steel Frame