Construction Cost Estimates for High School in Hastings, Nebraska
The following analysis estimates the cost to build a high school for Hastings, Nebraska. Costs are derived from a building model that assumes basic components, using union labor for a 130000 square foot building.
Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a high school in a different city or metropolitan area, go to our index of high school models by state.
NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.
High School Construction Cost Assumptions
Location:
Hastings, Nebraska
Stories:
2
Story Height (L.F.):
15.00
Floor Area (S.F.):
130000
Basement Included:
No
Data Release:
Year 2013
High School Square Foot Cost Assuming Decorative Concrete Block / R/Conc. Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
$105.52
$13,717,800
Contractor Fees (GC,Overhead,Profit)
25%
$26.38
$3,429,500
Architectural Fees
7%
$9.23
$1,200,300
Total Building Cost
$141.14
$18,347,600
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
$96.41
$12,532,800
Contractor Fees (GC,Overhead,Profit)
25%
$24.10
$3,133,200
Architectural Fees
7%
$8.44
$1,096,600
Total Building Cost
$128.94
$16,762,600
High School Square Foot Cost Assuming Decorative Concrete Block / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
High School Square Foot Cost Assuming Face Brick with Concrete Block Back-up / R/Conc. Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
High School Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
High School Square Foot Cost Assuming Limestone with Concrete Block Back-up / R/Conc. Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
High School Square Foot Cost Assuming Limestone with Concrete Block Back-up / Steel Frame