Construction Cost Estimates for High School in Ponca City, Oklahoma
The following analysis estimates the cost to build a high school for Ponca City, Oklahoma. Costs are derived from a building model that assumes basic components, using union labor for a 130000 square foot building.
Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a high school in a different city or metropolitan area, go to our index of high school models by state.
NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.
High School Construction Cost Assumptions
Location:
Ponca City, Oklahoma
Stories:
2
Story Height (L.F.):
15.00
Floor Area (S.F.):
130000
Basement Included:
No
Data Release:
Year 2013
High School Square Foot Cost Assuming Decorative Concrete Block / R/Conc. Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
$92.73
$12,055,100
Contractor Fees (GC,Overhead,Profit)
25%
$23.18
$3,013,800
Architectural Fees
7%
$8.11
$1,054,800
Total Building Cost
$124.03
$16,123,700
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
$84.72
$11,013,700
Contractor Fees (GC,Overhead,Profit)
25%
$21.18
$2,753,400
Architectural Fees
7%
$7.41
$963,700
Total Building Cost
$113.31
$14,730,800
High School Square Foot Cost Assuming Decorative Concrete Block / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
High School Square Foot Cost Assuming Face Brick with Concrete Block Back-up / R/Conc. Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
High School Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
High School Square Foot Cost Assuming Limestone with Concrete Block Back-up / R/Conc. Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
High School Square Foot Cost Assuming Limestone with Concrete Block Back-up / Steel Frame