Construction Cost Estimates for Jr High School in Pottsville, Pennsylvania
The following analysis estimates the cost to build a jr high school for Pottsville, Pennsylvania. Costs are derived from a building model that assumes basic components, using union labor for a 110000 square foot building.
Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a jr high school in a different city or metropolitan area, go to our index of jr high school models by state.
NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.
Jr High School Construction Cost Assumptions
Location:
Pottsville, Pennsylvania
Stories:
2
Story Height (L.F.):
15.00
Floor Area (S.F.):
110000
Basement Included:
No
Data Release:
Year 2013
Jr High School Square Foot Cost Assuming Concrete Block Stucco Face / Bearing Walls
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
$111.41
$12,254,700
Contractor Fees (GC,Overhead,Profit)
25%
$27.85
$3,063,700
Architectural Fees
7%
$9.75
$1,072,300
Total Building Cost
$149.01
$16,390,600
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
$102.80
$11,308,100
Contractor Fees (GC,Overhead,Profit)
25%
$25.70
$2,827,000
Architectural Fees
7%
$9.00
$989,500
Total Building Cost
$137.50
$15,124,600
Jr High School Square Foot Cost Assuming Concrete Block Stucco Face / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Jr High School Square Foot Cost Assuming Decorative Concrete Block / Bearing Walls
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Jr High School Square Foot Cost Assuming Decorative Concrete Block / Steel Frame
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Jr High School Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Bearing Walls
Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Cost Estimate (Open Shop)
% of Total
Cost Per SF
Cost
Total
Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost
$---.--
$-,---,---.--
Jr High School Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame