Construction Cost Estimates for Office (1 Story) in Juneau, Alaska

The following analysis estimates the cost to build an office (1 story) for Juneau, Alaska. Costs are derived from a building model that assumes basic components, using union labor for a 7000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build an office (1 story) in a different city or metropolitan area, go to our index of office (1 story) models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

Office (1 Story) Construction Cost Assumptions
Location: Juneau, Alaska
Stories: 1
Story Height (L.F.): 12.00
Floor Area (S.F.): 7000
Basement Included: No
Data Release: Year 2013

Office (1 Story) Square Foot Cost Assuming Brick on Block / Steel Roof Deck

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $162.54 $1,137,800
Contractor Fees (GC,Overhead,Profit) 25% $40.64 $284,500
Architectural Fees 7% $14.22 $99,600
Total Building Cost $217.40 $1,521,800
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $150.56 $1,053,900
Contractor Fees (GC,Overhead,Profit) 25% $37.64 $263,500
Architectural Fees 7% $13.17 $92,200
Total Building Cost $201.38 $1,409,600

Office (1 Story) Square Foot Cost Assuming Brick on Block / Wood Truss

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Medical Office, 1 Story Square Foot Cost Assuming Brick Veneer / Wood Truss

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Office (1 Story) Square Foot Cost Assuming EIFS on Metal Studs / Steel Roof Deck

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Medical Office, 1 Story Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Joists

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Medical Office, 1 Story Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Wood Truss

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Medical Office, 1 Story Square Foot Cost Assuming Stucco on Concrete Block / Steel Joists

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Medical Office, 1 Story Square Foot Cost Assuming Stucco on Concrete Block / Wood Truss

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Office (1 Story) Square Foot Cost Assuming Tiltup Concrete Panel / Steel Roof Deck

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Medical Office, 1 Story Square Foot Cost Assuming Wood Siding / Wood Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Office (1 Story) Square Foot Cost Assuming Wood Siding / Wood Truss

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--