Construction Cost Estimates for Post Office in Fort Mcmurray, Alberta

The following analysis estimates the cost to build a post office for Fort Mcmurray, Alberta. Costs are derived from a building model that assumes basic components, using union labor for a 13000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a post office in a different city or metropolitan area, go to our index of post office models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

Post Office Construction Cost Assumptions
Location: Fort Mcmurray, Alberta
Stories: 1
Story Height (L.F.): 14.00
Floor Area (S.F.): 13000
Basement Included: No
Data Release: Year 2013

Post Office Square Foot Cost Assuming Decorative Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $107.43 $1,396,600
Contractor Fees (GC,Overhead,Profit) 25% $26.86 $349,100
Architectural Fees 7% $9.40 $122,200
Total Building Cost $143.69 $1,867,900
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $98.78 $1,284,200
Contractor Fees (GC,Overhead,Profit) 25% $24.70 $321,000
Architectural Fees 7% $8.64 $112,400
Total Building Cost $132.12 $1,717,600

Post Office Square Foot Cost Assuming Decorative Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Limestone with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Limestone with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--