Construction Cost Estimates for Post Office in Chambers, Arizona

The following analysis estimates the cost to build a post office for Chambers, Arizona. Costs are derived from a building model that assumes basic components, using union labor for a 13000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a post office in a different city or metropolitan area, go to our index of post office models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

Post Office Construction Cost Assumptions
Location: Chambers, Arizona
Stories: 1
Story Height (L.F.): 14.00
Floor Area (S.F.): 13000
Basement Included: No
Data Release: Year 2013

Post Office Square Foot Cost Assuming Decorative Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $77.90 $1,012,600
Contractor Fees (GC,Overhead,Profit) 25% $19.47 $253,200
Architectural Fees 7% $6.82 $88,600
Total Building Cost $104.18 $1,354,400
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $71.63 $931,100
Contractor Fees (GC,Overhead,Profit) 25% $17.91 $232,800
Architectural Fees 7% $6.27 $81,500
Total Building Cost $95.80 $1,245,400

Post Office Square Foot Cost Assuming Decorative Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Limestone with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Limestone with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--