Construction Cost Estimates for Post Office in Palo Alto, California

The following analysis estimates the cost to build a post office for Palo Alto, California. Costs are derived from a building model that assumes basic components, using union labor for a 13000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a post office in a different city or metropolitan area, go to our index of post office models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

Post Office Construction Cost Assumptions
Location: Palo Alto, California
Stories: 1
Story Height (L.F.): 14.00
Floor Area (S.F.): 13000
Basement Included: No
Data Release: Year 2013

Post Office Square Foot Cost Assuming Decorative Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $107.52 $1,397,800
Contractor Fees (GC,Overhead,Profit) 25% $26.88 $349,500
Architectural Fees 7% $9.41 $122,300
Total Building Cost $143.81 $1,869,600
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $98.87 $1,285,300
Contractor Fees (GC,Overhead,Profit) 25% $24.72 $321,300
Architectural Fees 7% $8.65 $112,500
Total Building Cost $132.24 $1,719,100

Post Office Square Foot Cost Assuming Decorative Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Limestone with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Limestone with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--