Construction Cost Estimates for Post Office in Gaylord, Michigan

The following analysis estimates the cost to build a post office for Gaylord, Michigan. Costs are derived from a building model that assumes basic components, using union labor for a 13000 square foot building.

Scope differences and market conditions can cause costs to vary significantly. To see an estimate of the costs to build a post office in a different city or metropolitan area, go to our index of post office models by state.

NOTE: This cost estimate uses 2013 RSMeans data. A more accurate estimate using current RSMeans cost data is available on RSMeans Online - our online cost estimating tool.

Post Office Construction Cost Assumptions
Location: Gaylord, Michigan
Stories: 1
Story Height (L.F.): 14.00
Floor Area (S.F.): 13000
Basement Included: No
Data Release: Year 2013

Post Office Square Foot Cost Assuming Decorative Concrete Block / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total $81.05 $1,053,600
Contractor Fees (GC,Overhead,Profit) 25% $20.26 $263,400
Architectural Fees 7% $7.09 $92,200
Total Building Cost $108.40 $1,409,200
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total $74.53 $968,800
Contractor Fees (GC,Overhead,Profit) 25% $18.63 $242,200
Architectural Fees 7% $6.52 $84,800
Total Building Cost $99.68 $1,295,800

Post Office Square Foot Cost Assuming Decorative Concrete Block / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Face Brick with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Limestone with Concrete Block Back-up / Bearing Walls

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--

Post Office Square Foot Cost Assuming Limestone with Concrete Block Back-up / Steel Frame

Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--
Cost Estimate (Open Shop) % of Total Cost Per SF Cost
Total Interested in the complete estimate?
Contractor Fees (GC,Overhead,Profit)
Architectural Fees
Total Building Cost $---.-- $-,---,---.--