Demolition - 02 41 00
No description is available for this product type yet. If you are a community member, you can help build this directory by editing this entry to add your knowledge about Demolition.
- 02 41 13 - Selective Site Demolition
- 02 41 16 - Structure Demolition
- 02 41 19 - Selective Structure Demolition
- 02 41 91 - Selective Historic Demolition
Demolition Projects Up for Bid:
- FSP SMALL DIAMETER WATER MAIN REPLACEMENTS 2010 (Bids Due 2009-12-16)
- FSP DC SEWER REHABILITATION (Bids Due 2009-12-16)
- FORAN HIGH SCHOOL (Bids Due 2009-12-15)
- MINOT AFB MUNITIONS TRAILER STORAGE FACILITY (Bids Due 2009-12-15)
- MISSOURI RIVER WWTP DIGESTER (Bids Due 2009-12-11)
Tips on Estimating Demolition Costs from RSMeans
Demolition costs include the costs of actual demolition plus rubbish disposal, and removal from the site. Certain mechanical equipment containing flammable liquids or ozone-depleting refrigerants, electric lighting elements, communication equipment components, and other building elements may contain hazardous waste and must be removed, either selectively or carefully, as hazardous waste before the building can be demolished. |
Projects that Included Demolition:
- O'HARE AIRPORT TERMINAL 5 (Chicago, IL)
- DONAHUE TERRACE APARTMENTS (Baraboo, WI)
- OSU OHIO UNION PHASE 2 (Columbus, OH)
- PASSARELLE BUILDING (Flushing, NY)
- SANDY BEAUTY SALON (Duluth, GA)
- CAMP SHELBY BATH HOUSE & POOL (Camp Shelby, MS)
- WYNN ELEMENTARY SCHOOL (Oregon, OH)
- MOULTRIE HOUSING AUTHORITY (Moultrie, GA)
- PIONEER BUILDING (Asheville, NC)
- MOGAN CULTURAL CENTER-HVAC (Lowell, MA)

